22-24 Sierra Wynd (24- FG PR- Aug 14/19– 22 – FG PR Aug 19/19)

Notes

PP – Aug 31/18

22 – Staked LS with O/S – Aug 31/18

24 – Staked RS

22: RG package: Inv# 23508 – Sept 13/18

24: RG package: Inv# 23507 – Sept 13/18

June 11/19- Staked for FG

22: July 18/19- FG Package; Invoice#- 24921, Job#- 11-42, PO#- MAST_EED-C-138223

22: July 18/19- Supplied and installed rubber pavers; Invoice#- 24917, Job#- 11-42, PO#- MAST_EED-C-166542

24: July 18/19- FG Package; Invoice#- 24920, Job#- 11-43, PO#- MAST_EED-C-138224

22/24: FG GC – July 26/19

Aug 14/19- FG PR

Aug 19/19- FG PR

Aug 12/20- 22- Grade against the garage door is as high as it can be. The sod is at the bottom of the man door. Recommend raising the man door and siding and then we can adjust the grade to increase the slope away

Details

Builder Rohit Communities
Job No
Address 22-24 Sierra Wynd
City Fort Saskatchewan
Province
Country
Postal Code
Telephone
Fax
Email
Website
Plot Received May 24/18
Surveyed
Grade Assigned
Grade Completed
Grade Certificate Received
Grade Failed
Grade Passed FG Aug 14/19; 24------ FG Aug 19/19; 22
Invoice Date
Paid Date

Photos

Leave a Reply